Mobile office or office trailer
Work, meet and organize the jobsite.
Workstations, electrical outlets, lighting, heating and storage. Specify the number of occupants and planned meetings.
Get a quote for this requirementRead the site office guideOffice · Locker room · Toilets and washing facilities · Rest and eating area
Compare modular jobsite buildings for offices, toilets, locker rooms and break rooms. Describe how the building will be used, then request rental or purchase quotes including the fitted equipment, delivery, connections and servicing.

Describe the intended use and construction type: a wheeled office trailer, purpose-built modular building and converted shipping container are different products. Ask for the actual layout and equipment rather than relying on a shared size label.
Work, meet and organize the jobsite.
Workstations, electrical outlets, lighting, heating and storage. Specify the number of occupants and planned meetings.
Get a quote for this requirementRead the site office guideLet teams get changed.
Lockers, benches and heating. Indicate the number of users and clothing drying or separation needs.
Get a quote for this requirementProvide toilets, handwashing or task-specific showers.
Number of fixtures, water supply, utility connections or self-contained tanks. Include cleaning, water refills and wastewater pumping in the quote.
Get a quote for this requirementRead the jobsite sanitation guideProvide a space for meals.
Seating, tables, food storage and reheating. Specify the number of people eating together.
Get a quote for this requirementSpecify the rooms to combine or separate. To organize all site facilities, see our jobsite facilities guide and its jobsite facilities inquiry preparation tool.
No verified US building price sample is published on this page. Ask for a quote for the intended use and actual fitted model; a bare container or empty building is not a complete jobsite facility installation.
Specify the exact units, usable facilities, fittings and capacity for the proposed workforce and working hours.
Include delivery, unloading, supports, assembly, water and drainage arrangements, electricity and commissioning before work starts.
Price cleaning, consumables, tank emptying and water replenishment, maintenance, emergency replacement and final collection.
Ask for the charge period, applicable sales taxes, minimum rental, extension and notice terms, and every delivery or collection charge. Commercial rental terms do not change the requirement to provide suitable employee facilities from the start and throughout the work.
Request an itemized quotationAsk for the dimensions of the model offered. A nominal length such as 20ft does not establish its external footprint, finished internal area or permitted occupancy.
Request length, width, overall height and any roof, stair or equipment projection. These dimensions affect siting and transport.
Request clear dimensions after insulation, linings and services. Lay out furniture and required circulation before assigning an occupancy.
Obtain equipped mass, approved lifting points, foundation and anchorage requirements, and the actual door clear opening.
There is no single US building size. The downloadable site-layout rectangle is an illustration, not a supplier model or an approved building design. Use the exact model drawing to assess local snow, wind, frost, fire, energy and access requirements.
Identify federal OSHA or the approved State Plan covering the employer and work. Construction sanitation and general-industry rules are different. Confirm facilities before work starts and maintain them throughout the project.
Confirm coverage for the employer and the work. Some State Plans cover only state and local government workers; private-sector work in those states generally remains under federal OSHA. Workplace sanitation and building or zoning approvals are separate checks.
For construction under federal OSHA, 29 CFR 1926.51(c) sets toilet provision by workforce in Table D-1, with specific temporary-field and mobile-crew provisions. An approved State Plan can impose different or additional requirements. Establish the governing rule before choosing the number and type of fixtures.
Specify: Record peak workforce, shifts, fixture types, privacy, accessible use, travel time, safe access and servicing. Federal rules allow specified nonsewer facilities unless local codes prohibit them; portable toilets are not automatically acceptable for every site.
Federal construction 1926.51(f)(3) requires lavatories at places of employment, with a specific exception for mobile crews and normally unattended locations having transportation readily available to compliant nearby washing facilities. Lavatories need hot and cold or tepid running water, cleansing products and hygienic drying. Employees handling harmful substances also need adequate washing near the work under 1926.51(f)(1). Hand sanitizer is not a general replacement for required soap-and-water washing.
Specify: Identify supply, drainage, freeze protection and cleaning. If a particular OSHA standard requires showers, 1926.51(f) specifies one shower per ten employees of each sex, or fraction, showering during the same shift. Assess hazardous-work decontamination separately.
Federal 1926.51(g) prohibits eating and drinking in toilet rooms and areas exposed to toxic materials. Provide clean, usable arrangements for breaks and meals, and identify state heat, sanitation and employment requirements. The federal sanitation rule does not establish a single national lunchroom floor-area allowance.
Specify: State simultaneous users, furniture, cooling or safe heating, ventilation and cleaning. Keep food and drinking supplies separate from contaminants. Include rest access, shade or cooling and emergency arrangements where required for the actual work and climate.
State examples apply only in their jurisdiction. US requirements, exceptions and official references.
Start from the same intended use and equipment level. The period of use, moves and condition of the unit all affect the budget.
Add up the rental charges, delivery and collection, and services. Ask about the minimum charge, extension rate and collection terms.
Get a quote for this optionAsk for a detailed breakdown of equipment and options, lead times, warranty and installation costs. Allow for moves if the building will be relocated.
Get a quote for this optionAsk for recent photos and check the roof, floor, insulation, doors and services. Add any necessary repairs and interior build-out to the purchase price.
Get a quote for this optionCompare the total cost over your expected period of use, including a possible extension. There is no universal number of months after which buying becomes cheaper than renting.
Provide the delivery ZIP code and full project address so the supplier can quote installation and any necessary services. Establish permitting jurisdiction from the actual parcel and intended use; a ZIP code alone is not enough.
Gate width, bends, slope, overhead obstructions and space to maneuver. Photos help the discussion.
Distance from the truck to the position, ground conditions and any supports to be approved. State who will provide the unloading equipment.
Electricity, water and drainage depending on use. Give their distance from the building and ask for connection costs to be quoted.
Preferred date, acceptance of the unit, commissioning and maintenance. For rental, also plan access for collection.
Present the intended use, duration and parcel location to the responsible zoning and building authorities. Check building, fire, accessibility and utility approvals for the actual installation. A temporary jobsite use does not establish permission for a permanent office or housing. Public land and a public right-of-way may require separate permission.
Before fabrication or purchase, check the installation state's modular-building or commercial-coach program, including design review, inspections and labels. Texas's IHB program excludes a construction-site building defined as a commercial structure not open to the public, used at a commercial site by a person constructing a building, road, utility or other infrastructure or real-property improvement. This is a program-specific exclusion, not a general permit exemption. TDLR also says an otherwise exempt relocatable building bearing an IHB label must meet program requirements. See the Texas program FAQ, question 3.
Federal OSHA construction sanitation rules, general-industry rules and applicable State Plan standards have different scopes. Determine the employer and work activity before specifying employee facilities. Separately, the ADA Standards' construction exception concerns structures directly associated with actual construction processes; temporary use alone is not an accessibility exemption. Our jobsite facilities regulations guide explains the distinctions.
Type, condition, quantity and delivery: prepare your request to compare quotes for your project.
Specify whether you need a wheeled trailer, a building placed on supports or a converted shipping container. For sanitation, distinguish individual portable toilets from a restroom trailer or modular restroom building. Describe the use, dimensions, layout and equipment so quotes cover the same requirement.
Specify the workspace, comfort and equipment.
ReadDefine the facilities and plan the connections.
ReadOrganize all team spaces.
ReadCompare sizes for storing and transporting equipment.
ReadUS workplace guidance reviewed on . Request current equipment and servicing prices from the supplier; ContainerFox prepares inquiries.