These are the items to give your architect or designer, engineer and specialist contractors. Resolve them together before openings are cut or concealed factory work is closed.
Confirm the rules for the project address. ICC model codes need adoption by the relevant state or local jurisdiction. Confirm the applicable IRC or IBC edition, local amendments and any factory-building program, and agree the evidence for the completed home with the permit authority. Certification of an individual material or shipping container does not establish building compliance.
Structure and foundations
Openings, removed walls, stacking and cantilevers change the load path. Assess the actual shell condition, connections and lifting sequence.
Ask for: Site-specific foundation and structural design addressing ground conditions, frost, snow, wind and other applicable loads.
Use the locally adopted code and required professional design.
Fire safety and escape
Coordinate exits, bedroom escape, smoke alarms, any required carbon monoxide alarms, separations, linings, insulation, penetrations and fire-service access.
Ask for: A fire-safety design and material evidence for the complete assembly, including alarm locations, power and interconnection under the adopted code.
Steel alone does not establish the finished home's fire performance; carbon monoxide alarm requirements can depend on fuel-fired equipment, attached garages and local amendments.
Insulation and moisture
Resolve thermal bridges, air and vapor control, weatherproofing and condensation at roofs, floors, openings and joints.
Ask for: Climate-specific envelope details coordinated with ventilation and local energy requirements.
There is no single insulation thickness suitable for every US climate and location.
Heating and services
Select heating, cooling, hot water and electrical supply for the finished design. Plan freeze protection and maintenance access.
Ask for: Required energy calculations, trade permits, approved equipment and commissioning records.
Confirm state and local requirements before specifying equipment.
Ventilation and comfort
Plan fresh air and extraction around occupancy, moisture and the airtight envelope. Assess summer heat as well as winter operation.
Ask for: Ventilation design, installation details and commissioned operation.
Use the requirements adopted for the site's climate and occupancy.
Finished rooms and access
Measure clear rooms after insulation, structure and services. Allow for doors, stairs, bathrooms, exits, headroom and the raised entrance.
Ask for: Dimensioned finished plans addressing applicable room and accessibility requirements.
Bare-shell floor area is not a permit exemption or occupancy approval.
Land and shell history
Investigate soil conditions, flooding, contamination and drainage. Check previous cargo, coatings and timber floors when selecting a used shell.
Ask for: Site investigations and required environmental, wastewater, stormwater and utility approvals.
Confirm additional local and public-health requirements.
Radon and soil gas
Address soil-gas entry in the foundation and service-penetration design using the code adopted for the site. Coordinate any required provisions for later radon mitigation.
Ask for: Foundation details and a plan for long-term radon measurement after occupation, using EPA guidance and an appropriate test protocol under normal living conditions.
EPA recommends fixing homes at 4 pCi/L or above and considering action at 2–4 pCi/L. Testing remains necessary even with radon-resistant construction; these are health recommendations, not a nationwide permit rule.
Builder licensing and new-home protection
Before contracting, establish which state or local contractor licenses, registration, insurance, bonds and legally required warranties apply to the actual construction arrangement.
Ask for: Verify required licenses, insurance and any required project registration or warranty coverage, or the conditions of a valid exemption, with the responsible regulator or program.
Factory-built and owner-built homes can have different rules. These legal checks are separate from a lender's or insurer's requirements.
Factory work and final approval
Fabrication can conceal critical details before inspectors see them. Allocate responsibility for site joints and transport damage.
Ask for: Inspection plans, photographs, certificates, test results and required occupancy documentation.
Factory delivery and warranties do not replace local approval.